Skip to content
Joel Goh

D10 · Condominium

Skye at Holland

Holland Village Way, Holland Village. Developed by UOL Group, Singapore Land Group, Kheng Leong and CapitaLand Development.

What is on the record

Compiled from the published source below and checked on that date. Where a figure is disputed between sources it is left out rather than averaged, and where the only price available was a portal listing range it is omitted — those ranges mix developer stock with subsale and are not a developer price.

Developer
UOL Group, Singapore Land Group, Kheng Leong and CapitaLand Development
District
D10 · Core Central
Tenure
99-year leasehold
Type
Condominium
Total units
666
Unit mix
2 to 5 bedrooms, 54–164 sqm
Expected completion
2029
Status
Fully sold
Nearest MRT
Holland Village (Circle Line)
Address
2 Holland Village Way, Singapore 279035
Earliest published PSF
$2,946 psf

Source: published report. Figures verified 2026-08-02

Developments are listed here as a compiled reference. Nothing on this page is a claim of exclusivity, and no figure is a substitute for the developer’s own price list on the day you buy.

Measured, not asserted

What is actually within reach

Straight-line distances from this development’s site coordinate. Straight-line is the measure MOE uses for school registration priority; it is not a walking route, and a hundred metres on this list can be a five-minute detour on the ground.

Primary schools within 2km

MRT stations within 1km

Lines reachable on foot

Shopping malls within 1km

Bus interchanges within 1km

An interchange is also a bus depot, and depots start before five in the morning. Worth asking which stacks face the bus park.

Walking minutes are derived from the straight line at roughly 80 m a minute, which makes them a floor rather than an estimate. The real route is always longer.

Availability and pricing change weekly

Unit availability, the current price list and any developer incentive come from the developer’s own system on the day, and go out of date faster than any website can follow. Rather than publish a number that will be wrong by the weekend, ask and it will be checked with you.

On a developer sale the commission comes from the developer, not from you. Having someone walk the unit mix, check the stack and do the stamp duty arithmetic costs you nothing.

Ask Joel about Skye at Holland