D10 · Condominium
UpperHouse at Orchard Boulevard
Orchard Boulevard, Tanglin. Developed by United Venture Development (No. 7) Pte. Ltd. (UOL Group and Singapore Land Group).
What is on the record
Compiled from the published source below and checked on that date. Where a figure is disputed between sources it is left out rather than averaged, and where the only price available was a portal listing range it is omitted — those ranges mix developer stock with subsale and are not a developer price.
- Developer
- United Venture Development (No. 7) Pte. Ltd. (UOL Group and Singapore Land Group)
- District
- D10 · Core Central
- Tenure
- 99-year leasehold
- Type
- Condominium
- Total units
- 301
- Unit mix
- 1-bedroom + study to 4-bedroom suite, 474–2,056 sqft
- Expected completion
- 2029
- Status
- Now selling
- Nearest MRT
- Orchard Boulevard (Thomson-East Coast Line)
- Address
- 22 Orchard Boulevard, Singapore 249628
The developer styles it UpperHouse @ Orchard Boulevard. A footer on the developer site and several agent microsites give D09; postal sector 24 and both portals give D10.
Source: published report. Figures verified 2026-08-02
Developments are listed here as a compiled reference. Nothing on this page is a claim of exclusivity, and no figure is a substitute for the developer’s own price list on the day you buy.
Measured, not asserted
What is actually within reach
Straight-line distances from this development’s site coordinate. Straight-line is the measure MOE uses for school registration priority; it is not a walking route, and a hundred metres on this list can be a five-minute detour on the ground.
Primary schools within 2km
MRT stations within 1km
Lines reachable on foot
Walking minutes are derived from the straight line at roughly 80 m a minute, which makes them a floor rather than an estimate. The real route is always longer.
Same district, then same region
Other developments worth comparing
D10 · Core Central
Skye at Holland
Holland Village Way, Holland Village
Expected completion 2029
D01 · Core Central
W Residences Marina View — Singapore
Marina View, Marina Bay
Expected completion 2029
D02 · Core Central
Newport Residences
Anson Road, Tanjong Pagar
Expected completion 2027
D09 · Core Central
River Modern
River Valley Green
Expected completion 2030
Availability and pricing change weekly
Unit availability, the current price list and any developer incentive come from the developer’s own system on the day, and go out of date faster than any website can follow. Rather than publish a number that will be wrong by the weekend, ask and it will be checked with you.
On a developer sale the commission comes from the developer, not from you. Having someone walk the unit mix, check the stack and do the stamp duty arithmetic costs you nothing.
Ask Joel about UpperHouse at Orchard Boulevard